top of page

Manufacturing & Industrial Safe Work Method Statements (SWMS) Value Pack

 

Introduction:

Our Industrial & Manufacturing SWMS Value Pack is specifically designed for businesses operating within the industrial and manufacturing sectors. This extensive package includes 32 detailed SWMS templates covering a broad range of activities, from everyday operations like manual handling and using power tools to specialised tasks such as hot works and high voltage operations. These templates are designed to be seamlessly incorporated into your Workplace Health and Safety (WHS) management systems, offering full customisation to accurately document the specific hazards and safety measures relevant to your operations.

 

SWMS Included in the Bundle:

  • Air Compressor
  • Angle Grinder
  • Chemicals
  • Confined Space Entry
  • Covid 19
  • Drill Press
  • Electrical Work
  • Elevated Work Platforms (EWP)
  • Forklift
  • Fuel Storage, Refuelling, and Decanting
  • General Plant
  • Hand, Air & Power Tools
  • Handling Hazchem
  • Heat Gun
  • Heavy Lifting Using Forklift, Jibs, and Slings
  • High Voltage (De-energised)
  • Hot Works
  • Ladder
  • Lathe
  • Loading and Unloading Pallets
  • Loading and Unloading Trucks
  • Manual Handling
  • Mechanical Lifting
  • Mobile Plant
  • Parts Washer
  • Soldering Iron
  • Use of Lasers
  • Welding & Cutting
  • Wiring
  • Working Around Plant & Equipment
  • Working at Heights
  • Working with Electricity

 

Additional Resources:

Included with the purchase of the Industrial & Manufacturing SWMS Value Pack is a complimentary copy of our Legislation & Codes of Practice Reference List. 

 

Key Features:

The Industrial & Manufacturing SWMS Value Pack is an essential tool for helping to document and manage WHS procedures effectively within the industrial and manufacturing sectors. The templates are designed for quick and easy customisation, allowing businesses to adapt and modify the content to meet their specific operational needs. Equip your business with this robust package to help foster a safer working environment.

Manufacturing & Industrial Safe Work Method Statements (SWMS) Value Pack

$395.00Price
GST Included
  • Instant delivery via email.
  • Easily add your logo and business details.
  • Fully Editable (Microsoft Word Format).
  • Customisation instructions provided.
  • In line with Australian legislation.
  • Pay once, no ongoing subscriptions.
bottom of page