Transportation & Warehousing Safe Work Method Statements (SWMS) Value Pack
Introduction:
The Transportation and Warehousing SWMS Value Pack is a comprehensive bundle of templates designed to help businesses in the transportation and warehousing sectors document their safety procedures effectively. This value pack comprises 38 detailed SWMS templates that cover a wide range of activities, from general driving and manual handling to specific operations such as rigging, chain blocks, and telehandler forklift operations. These templates are fully customisable, allowing easy integration into your existing Workplace Health and Safety (WHS) management systems.
SWMS Included in the Pack:
- Chemicals
- Cleaning of Vehicles
- Confined Space Entry
- Driving a Vehicle
- Driving in Remote Locations
- Elevated Work Platforms (EWP)
- Forklift
- Fuel Storage, Refuelling, and Decanting
- Fuel
- General Plant
- Hand, Air, and Power Tools
- Handling Hazchem
- Heavy Lifting Using Forklift, Jibs, and Slings
- Ladder
- Loading and Unloading Pallets
- Loading and Unloading Trucks
- Manual Handling
- Manual Jack
- Manual Tyre Change
- Mechanical Lifting
- Mobile Plant
- Operation of Trucks
- Picking Up and Unloading of Skip Bin
- Preparation of Load Export Containers
- Refuelling Plant and Equipment
- Rigging & Chain Blocks
- Telehandler Forklift
- Tipper
- Traffic Control
- Traffic Management Sign Setup
- Truck Driving (Fatigue)
- Truck Driving (Speed)
- Truck Driving (General)
- Truck Haulage
- Truck Mounted Crane
- Watercart
- Working Around Plant & Equipment
- Working Around The Public
Additional Resources:
Purchase of the Transportation and Warehousing SWMS Value Pack includes a free copy of our Legislation & Codes of Practice Reference List.
Key Features:
This SWMS Value Pack is specifically designed to give transportation and warehousing businesses a range of robust tools for documenting and managing workplace safety. The templates are easy to use and quick to customise, allowing you to tailor them to specific operational needs. Equip your team with this comprehensive package to help ensure a safer working environment.
Transportation & Warehousing Safe Work Method Statements Value Pack
Key Details:
- Instant delivery via email.
- Easily add your logo and business details.
- Fully Editable (Microsoft Word Format).
- Customisation instructions provided.
- In line with Australian legislation.
- Pay once, no ongoing subscriptions.