Electrical & HVAC Safe Work Method Statements (SWMS) Value Pack
Introduction:
The Electrician & HVAC SWMS Value Pack is an essential collection of templates tailored for professionals in the electrical and heating, ventilation, and air conditioning (HVAC) sectors. This package includes 25 specific SWMS that cover a wide range of activities, from basic manual handling and ladder use to specialised tasks like high voltage work and air conditioner installation. Designed for easy integration into your Workplace Health and Safety (WHS) management systems, these templates are fully customisable, allowing businesses to efficiently document the typical hazards and safety controls relevant to their operations.
SWMS Included in the Pack:
- Air Conditioner Installation
- Alarm & Access Control Installation
- Battery Test & Charge
- Cable & Ladder Tray Installation
- Confined Space Entry
- Covid 19
- Display & Equipment Installation
- Driving a Vehicle
- Electrical Work
- Elevated Work Platforms (EWP)
- High Voltage Work (De-energised)
- Installation and Termination of UTP Cabling
- Installation of Cable & Fire Equipment
- Ladder
- Manual Handling
- Power Tools
- Security, CCTV, and Data Cable Installation
- Site Safety (General)
- Wiring
- Working Around Plant & Equipment
- Working Around The Public
- Working at Heights
- Working from Tower
- Working in Private Residences
- Working with Electricity
Additional Resources:
Included is a complimentary copy of our Legislation & Codes of Practice Reference List.
Key Features:
The Electrician & HVAC SWMS Value Pack is designed to be a quick and easy tool for electricians and HVAC technicians to document their WHS systems comprehensively. The templates allow for rapid editing and full customisation to meet specific business requirements, providing a practical solution to managing workplace safety effectively. This value pack equips businesses with the necessary tools to maintain high safety standards while streamlining documentation and enhancing operational efficiency.
Electrical & HVAC Safe Work Method Statements (SWMS) Value Pack
Key Details:
- Instant delivery via email.
- Easily add your logo and business details.
- Fully Editable (Microsoft Word Format).
- Customisation instructions provided.
- In line with Australian legislation.
- Pay once, no ongoing subscriptions.